j chu engineering LLC

559 union avenue
middlesex, new jersey 08846

NYS Entity Status
ACTIVE

NYS Filing Date
DECEMBER 03, 2013

NYS DOS ID#
4495060

County
NEW YORK

Jurisdiction
NEW JERSEY

Registered Agent
NONE

NYS Entity Type
FOREIGN PROFESSIONAL SERVICE LIMITED LIABILITY COMPANY

Name History
2013 - J CHU ENGINEERING LLC









Buffer

submit to reddit

Telephone
n/a

Fax
n/a

Website
n/a

Email address
n/a

LinkedIn
n/a

Facebook
n/a

Google+
n/a

Twitter
n/a

Pinterest
n/a

Instagram
n/a



  • Around the Web

  • Women of Sex Tech, Unite
    By ANNA NORTH - Friday Aug 18, 2017

    New York is becoming a cultural center for young women trying to disrupt the male-dominated industries of design engineering and sex toys.

    Source: NYT > Home Page
  • Sheriff says 3 survive plane crash into Virginia home
    Saturday Oct 7, 2017

    MIDDLESEX, Va. (AP) — Authorities say a small plane crashed into a home in Virginia and the three people on board survived with minor injuries.No one was home at the time of the crash. Middlesex County Sheriff David Bushey tells WWBT the single-engine plane took off just before 9 a.m. Saturday from an airport in Topping, about an hour east of Richmond. Two adults and a juvenile were on board.The station reports the pilot lost control, flew between two trees, and crashed into the home in Middlesex County.A photo of the scene showed extensive damage.Bushey says the people on board the plane were taken to a hospital and have since been released.___Information from: WWBT-TV, http://www.wwbt.com/

    Source: SFGATE.com: Top News Stories
  • Trump’s Tough Talk on North Korea Puts Japan’s Leader in Delicate Spot
    By JONATHAN SOBLE - Friday Aug 11, 2017

    North Korea’s accelerating military advances — and President Trump’s volatile response — could complicate Japan’s close alliance with the United States.

    Source: NYT > Home Page
  • Millennium Tower keeps on sinking, but there may be a fix
    By Matier & Ross - Tuesday Jul 18, 2017

    City officials and other sources familiar with the situation tell us that the building, which as of last year had sunk 16 inches since construction got under way in 2005, continues to descend into the bay fill at Mission and Fremont streets.The sinkage is more pronounced on the northern side, the direction in which the tower is leaning 2 inches at its base, said the sources, who spoke on condition of anonymity because the Millennium’s problems are the subject of numerous lawsuits.The good news for the tower’s well-heeled residents, who paid from $1.6 million to $10 million for their condominiums, is that a pair of engineering firms hired by developer Millennium Partners and other parties involved in the dispute think they have a solution that will stabilize the tower and prop it back upright.After we first reported the Millennium Tower’s problems in August, the developer insisted that its decision not to anchor the foundation to bedrock in the first place had nothing to do with the building’s sink and lean — and that the ground under the building had been destabilized by neighboring construction.The engineering firms estimate the fix will cost $100 million to $150 million — more than your average home foundation repair, but a lot less than the billion-dollar-plus price tag that some experts have feared.Like so many other things involving the slow-motion fiasco, just who would pay the bill would be the subject of negotiation, and possibly litigation, involving Millennium Partners, the homeowners association and the public agency building the Transbay Transit Center next door, which the developer and condo owners insist bears some responsibility.P.J. Johnston, spokesman for Millennium Partners, declined to comment on the talks or the latest engineering report, but said, Our highest priority has always been to fix the building.Jack Gallagher, a spokesman for the San Francisco city administrator’s office, which is reviewing all downtown high-rise construction in the wake of the Millennium Tower’s problems, said no repair plan has been submitted to the city for permits.Bill Strawn, spokesman for the Department of Building Inspection, said his office had just received the latest engineering report on the building’s slippage, and had sent it to the city’s data engineers for review.[...] he said, the department sent out a team of inspectors Tuesday to follow up on a report done six months ago detailing cracking and other damage from the building’s movement, and a list of repairs that needed to be done in the short term.Millennium Partners says the tower’s problems were caused by construction crews pumping groundwater from the adjacent site, which the developer says destabilized the soil under the tower.The transbay authority argues that the slippage has continued long after the pumping ended, proving that the culprit was the developer’s decision not to drive piles all the way to bedrock.About 100 condo owners got a small break this week, when city Assessor Carmen Chu began notifying them that their 2017 property-tax bills are being reduced by about $3,000 apiece — reflecting an average $320,000 drop in value on each of their units.

    Source: SFGATE.com: Bay Area News
  • Neighborhoods That Play Hard to Get
    By STEFANOS CHEN - Friday Aug 11, 2017

    In some New York neighborhoods, the housing stock is great, but turnover is so low, word of mouth is the best search engine.

    Source: NYT > Home Page
  • The Top 10 Moments of New York Fashion Week
    By THE NEW YORK TIMES - Friday Sep 15, 2017

    Highlights from the shows, including a celebrity-packed front row at Calvin Klein and a trek to Bedford Hills, N.Y., to see Ralph Lauren’s vintage cars.

    Source: NYT > Home Page